Torthaí beachta
Exact matches
#
the reclamation of an area of approximately 1.55 hectares between the said quay and Pigeon House Road, including the construction of a stone embankment and retaining wall along the western perimeter of the reclaimed area
limistéar de 1.55 heachtár tuairim a mhíntiriú idir an ché sin agus Bóthar Thigh Mhic Coluim, lena n-áirítear claífort cloiche agus balla cuibhrithe a thógáil feadh imlíne thiar an limistéir mhíntírithe
Torthaí gaolmhara
Related matches
Níor aimsíodh téarma ar bith.
No terms found.