882
Líon torthaí a aimsíodh
Number of matches found
#
an ceangal idir baoi agus fearas
rope connecting buoy to that part of the gear being supported or marked
#
(of trawl)
#
(of trawl)
#
FÉACH FREISIN · SEE ALSO
# clár tirimlíneála · dry lining board # spúinse tirimlíneála · dry lining sponge#
Trácht Aon Líne Amach Romhat
Single Line Traffic Ahead
Trácht Aon Lána Romhat
Single File Traffic Ahead
#
Marc ar long a thaispeánann a doimhneacht is mó lódála.
A mark on a ship showing the maximum depth it may be loaded to.
Baineann an táille iomlán faoi fhomhír (a) le suirbhéireacht ualachlíne má dhéantar an dá shuirbhéireacht an tráth céanna. FOINSE: I.R. 1981
The full fee under subparagraph (a) covers a survey for loadline if both surveys are made at the same time.
(i) ar an ualachlíne iomchuí a chur faoi uisce, is í an táille atá forordaithe i bhfomhír (a) (i) den Airteagal seo an táille is iníoctha; FOINSE: I.R. 1981
(i) for the submersion of the appropriate load line, the fee payable shall be that prescribed in paragraph (a) (i) of this Article;
(c) ar shuirbhéireacht ar long arna coinneáil faoi Chuid II den Acht Loingis Cheannaíochta (Convensiúin um Shábháltacht agus um Ualach-Líne), 1933 (Uimh. 12 de 1933)- FOINSE: I.R. 1981
( c ) for the survey of a ship detained under Part II of the Merchant Shipping (Safety and Load Line Conventions) Act, 1933 (No. 12 of 1933)—