▼ Engineering
▼ Innealtóireacht
▼ Civil Engineering
▼ Innealtóireacht Shibhialta
Engineering Equipment
Trealamh Innealtóireachta
Roads
Bóithre
Roghanna
Options
1088
Líon torthaí a aimsíodh
Number of matches found
#
Please shut the gate
Dúntar an geata le do thoil
Please do not lock your bicycles to this entrance gate
Ná ceanglaigí bhur rothair den gheata seo
#
permeable material in the form of a manufactured sheet, used in geotechnical and civil engineering applications with the purpose of reducing or preventing the flow of fluid and/or vapour through the construction
#
planar synthetic material used in contact with soil/rock and/or other geotechnical material in filtration, drainage, separation, reinforcement, protection, packing, erosion control and sealing applications
#
(on road sign)
#
(traffic jam)
#
In civil engineering of shorelines, hard engineering is generally defined as controlled disruption of natural processes by using man-made structures.
#
HUMP-BACK BRIDGE AHEAD SLOW
GO MALL - DROICHEAD DRONNACH ROMHAT
HUMP-BACK BRIDGE SLOW
GO MALL - DROICHEAD DRONNACH
#
(not fixed or firm)
#
These are applied where the presence of pedestrians or pedestrians with a special characteristic (e.g.,
school children) may share a road space in a largely unsupervised manner. Treatments include
pedestrian warning signs, shared zones, school zones, local area traffic management schemes, and
lighting.
#
(road)
(bóthar)
Caution Junction Ahead
Aire - Acomhal Romhat
Dangerous Junction Ahead
Acomhal Baolach Romhat
Acomhal Contúirteach Romhat
New Junction Layout Ahead
Acomhal Athraithe Romhat